The military coup in Niger has raised concerns about uranium mining in the country by the French group Orano, and the consequences for France's energy independence.
It’s not just the UK. Every third gen PWR has taken way longer than expected.
The public rightly insist on the safest designs possible. And those at least have been tried once (generally only once!). However, they take a long time.
@Ardubal @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis That graph includes some huge deployments of wind, and today, it’s a mature, cheap technology (though still improving). Same with solar.
On the timescale on which the historic installs occurred, that was not the case: nuclear and hydro were the only mature options.
@Ardubal @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis Can you name *one* nuclear project in the last 20 years in Europe that wasn’t severely over-budget and severely delayed?
It’s not just the UK. Every third gen PWR has taken way longer than expected.
The public rightly insist on the safest designs possible. And those at least have been tried once (generally only once!). However, they take a long time.