ATLANTA (AP) — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

      • reddig33@lemmy.world
        link
        fedilink
        arrow-up
        3
        ·
        1 year ago

        Well that’s a shame. If you’re going to build new reactors, why not try a newer design that’s less risky and puts out less waste? Still waiting for a pebble reactor, for example.

        • yaaaaayPancakes@lemmy.world
          link
          fedilink
          arrow-up
          5
          ·
          1 year ago

          Look, just because it’s a PWR, doesn’t mean it’s a bad design by default.

          Fukushima was a Gen II reactor. These new reactors are Westinghouse AP1000’s and they’re classified as Gen III+. By comparison, Fukushima’s reactors are archaic in design.

          Gen III+ reactors are smaller, and are greatly simplified designs, and most importantly, have passive cooling features. Passive cooling is what Fukushima didn’t have. If the external power gets cut to these new reactors for an extended period of time, AND the backup generators get knocked out too, they can leverage these passive features to cool the reactor and prevent a Fukushima-style event.