• tryptaminev 🇵🇸 🇺🇦 🇪🇺@feddit.de
    link
    fedilink
    English
    arrow-up
    46
    ·
    1 year ago

    Also the plants were sheduled tobgo offline around that time since the early 2000s. Only because the CDU and FDP expanded the runtime and stiffled the upscaling of renewables, but then decided to roll back the extension bc. of Fukushima, we are now at the place we are at. Ofc. the renewables were not put back on track but systematically blocked by the government, which is why we still have so much coal.

    And it cost us a couple billions to roll back on the original plan and then again roll back on the roll back.