Member how there was a 6 month+ lead time on industrial sized switchgear during covid that delayed numerous manufacturing projects? Imagine that but 100x worse and for years on end.
I distinctly remember industrial switchgears being so limited that brokering an entire 53’ semi truck to exclusively load up one (1) switchgear and haul ass across the entire country just for that one piece was not even given a second thought - it was obvious to do, something that would have been insane 5 years prior.
It didn’t matter how much money we offered, the switchgears simply did not exist to sell. Delayed that project for almost a year.
I hope our Chinese comrades look forward to their futures. I will be going down with the ship in the imperial core.
Member how there was a 6 month+ lead time on industrial sized switchgear during covid that delayed numerous manufacturing projects? Imagine that but 100x worse and for years on end.
I distinctly remember industrial switchgears being so limited that brokering an entire 53’ semi truck to exclusively load up one (1) switchgear and haul ass across the entire country just for that one piece was not even given a second thought - it was obvious to do, something that would have been insane 5 years prior.
It didn’t matter how much money we offered, the switchgears simply did not exist to sell. Delayed that project for almost a year.
I hope our Chinese comrades look forward to their futures. I will be going down with the ship in the imperial core.